20" Gas Pipeline To Bazian Power Plant

Construction of 16 Km 20″ gas pipeline with 2 tie-in station connecting Khor Mor gas pipeline to Bazian power plant. The works include metering facilities, gas analyzer, pigging facilities, control rooms, pipeline detection system..
Pipeline works were performed in challenging conditions passing through towns and crossing multiple UG infrastructure.

PROJECT TYPE

CLIENT

Qaiwan Group