35,000 Bbl Production Facility Expansion
35,000 BBL Production facility upgrade (brown field project) which includes the installation of equipment (HP/LP flares, KO drums, gas boot…), demolition of existing equipment and systems, supply and installation of piping works, painting, and insulation.