Project Detail

Pipeline Export Facilities

The project consists of a pumping and metering station (PSAT) at KP 0.0, located within Atrush production facility, an intermediate pigging and pressure reduction station (IPPR) at KP 6.4, a 10″ pipeline from the Atrush production facility to KP 6.4 and a 12″ pipeline from KP 6.4 to the Atrush block boundary KP 8.58

CLIENT: Taqa
CATEGORY:
By browsing this website, you agree to our privacy policy.
I Agree