PSK Gas Injection Network
An underground 22 km, 6″ pipeline that connects the compressor station T2 to wellhead T24.
The project includes construction and interconnecting piping works for the wellhead injection facilities at T2, TA1, T26, T24 as well as the construction of block valve stations 1 and 2.